Ghost Factory
Ft. Bliss Production
0
streak
SYNCING
New Run
Active Job
Log
Coils
Dashboard
NCRs
Calibration
Settings
New Run
Select station, product, barracks, and structure. Hit Start to begin — timer and checklist activate automatically.
Station
Product Type
Barracks
Select barracks...
Structure / Component ID
Select product & barracks first...
Coil ID
Select coil...
Crew
Select crew
Operator
Select...
No operators added yet. Admin can add them in Settings.
START RUN
-
-
00:00
Elapsed
START
--
END
--
Shop Drawing
View Drawing
Open External
In-Production Log
+ Add Entry
Coil Change
Measurement
Note
Log Entry
All Checks Passed
Notes (optional)
COMPLETE JOB
CANCEL JOB
Production Log
CSV
Traceability
Copy
Sync
No completed jobs yet.
Coil Receiving
Log every coil at arrival. Links to production jobs through Coil ID.
Coil ID
Supplier
Supplier Coil ID
Heat Number
PO Number
Gauge
Width
Coating
Weight (lbs)
Total LF on Coil
Mill Cert on File
Yes
No
Attach Mill Cert
📄
Tap to upload photo or PDF
Log Coil
Production Overview
Progress by Barracks
Structures completed vs total per barracks.
Progress by Station
Crew Production Rates
Average run time per operator/crew lead.
Coil Inventory
Total LF loaded, consumed, and remaining per coil.
Today's Activity
Data Protection
Non-Conformance Reports
Track, review, and disposition NCRs. Review and disposition actions require admin access.
Resolved NCRs (0)
▼
Shift Calibration
Operator
Micrometer
Caliper
Web Depth
Flange Width
Length
Pass/Fail
PASS
FAIL
SUBMIT CALIBRATION
Today's Calibrations
No calibrations yet today
Equipment Registry
Register equipment and instruments. Used for maintenance logs and calibration tracking.
Type...
Roll-Former
Assembly Table
Measuring Tool
Screw Gun
Other
Cal interval...
Daily
Weekly
Bi-Weekly
Monthly
Quarterly
Annually
N/A
Add
Maintenance Log
Log maintenance events — inspections, adjustments, repairs. Required per QC Manual Section 11.
Equipment
Select equipment...
Performed By
Type
Select...
Routine Inspection
Adjustment
Repair
Breakdown
Calibration
Description
QC Re-Verification Needed?
Yes
No
QC Verified By
LOG MAINTENANCE
Recent Maintenance
No maintenance logged
Google Sheets
Paste your Apps Script Web App URL to auto-sync completed jobs.
Save
Disconnected
Test
Structure Library
Pre-loaded structure IDs. Edit per product and barracks.
Wall Panel
Roof Truss
Roof Panel
Load
Add
Admin Access
PIN-protected admin controls. Set your PIN on first use. Only admin can delete jobs, edit records, clear data, or override station dependencies.
Locked
Unlock
🔒
Admin locked
— Enter your PIN above to unlock admin controls. Stays unlocked until you hit Lock.
Job Management
SELECT JOB TO VOID
REASON
Void This Job
Cancel
Void a Job
Edit Job Record
Clear All Jobs
Coil Management
Delete Last Coil
Clear All Coils
Manage Operators
Add
Manage Zones
Add
Override
Skip Dependencies: OFF
Change PIN
Data Management
Export JSON Backup
Import Data
HOLD
Quality check failed. Production stopped. Describe the issue below.
Resolved - Resume
Open NCR & Stop
Close
Mill Certificate
Close
Shop Drawing